so Because when I wrote it in May the answer was still pending. answer came back in August and by then assessment.
so Because. answer was still. and by then assessment.
actually So the most important dependency on the project is a.
Right. Kwame, note that as the first item on the phase two dependency list, and it needs a date and an owner.
Owner on which side?
right Priya nominally. But she has told Tomas twice twice that she will not raise a change request for something outside the current phase, and she is right, so the real owner is whoever runs phase two.